Been a bit slow on the house. Weekend and a public holiday. I had Steve assist with the plumbing. We went to the local shops and bought our requirements. Then did the installation on Saturday and Sunday. Completed first fix this morning.
Bops men were busy with preparing the ground floor ring beam. Plan is to have an open area under the bedrooms. But it still needs to be raised about ground level and so first a ring beam, then a concrete slab. We'll put the concrete in later which will give the area some time to consolidate. i.e. people walking over it each day etc.